Santa Fe County rainwater catchment requirements

Know which jurisdiction governs your project before designing a cistern. Official County, City and State sources reviewed November 27, 2026.

Prepared by the Santa Fe Cistern Installation Editorial TeamLast reviewed November 27, 2026 · Editorial standards

Find your next jurisdiction step

A mailing address or ZIP does not establish legal jurisdiction.

County rules

County SLDC §7.13.11.7 covers qualifying new residential and new or remodeled nonresidential development, with exceptions. Qualifying residential provisions specify collection from at least 85% of roofed area. Certain larger projects require buried or partially buried insulated storage, pumping and irrigation connections, with a minimum of 1.15 gallons per square foot of captured roof area.

The 2,500 square foot boundary

Current County web guidance uses greater-than-or-equal and less-than-or-equal language around 2,500 square feet, while the current Single Family Residence checklist describes 2,500 square feet or greater versus less than 2,500 square feet. Because the published wording is not perfectly aligned, confirm the applicable interpretation, additions and exceptions with County staff for your parcel. Do not use a calculator as a permit decision.

City versus County

The incorporated City of Santa Fe is a separate permitting jurisdiction. The City publishes a dedicated Rain Water Harvesting System checklist within its construction permit resources, and its building-permit page states that permits are required for most construction work. A Santa Fe mailing address does not establish jurisdiction; confirm the parcel authority and the permit path before design or excavation.

State water rights

State guidance generally allows residential roof collection for landscape irrigation without a state water-rights permit. That does not remove local construction, plumbing, electrical or excavation requirements. Commercial and potable uses need specialist review.

Official references

County stormwater and water harvesting requirements · County Single Family Residence checklist · County SLDC · City permit checklists · New Mexico State Engineer

City versus County at a glance

QuestionUnincorporated Santa Fe CountyCity of Santa Fe
Who is the permitting authority?Santa Fe County Growth Management / Land UseCity of Santa Fe Land Use Department
Rainwater-specific published guidanceCounty SLDC and water-harvesting requirementsCity Rain Water Harvesting System permit checklist
Can a ZIP code decide jurisdiction?No. Confirm the actual parcel jurisdiction before applying either set of requirements.