Before design approval
Confirm parcel jurisdiction, development type and roof-area calculations with the relevant permit authority. Coordinate roof drainage and proposed storage with the architect.
Before excavation
Ask the builder and installer to agree on utility marking, equipment access, foundation separation, tank delivery, burial specification and inspection sequence.
Before handover
Document pump and controls, overflow, irrigation zones, commissioning, maintenance access, warranties and responsibility for approvals.
Prepare a builder coordination brief
- Parcel jurisdiction and development type
- Roof plan and proposed capture area
- Tank location, equipment access and utility constraints
- Installer responsibilities and inspection sequence
- Landscape water demand and handover documentation
Coordinate roof and landscape design
Plan roof drainage, tank excavation and landscape water demand together.
Questions before requesting a quote
How much will the installation cost?
Costs depend on the tank, site access, excavation, collection piping, pump and restoration. See the cost planning guide for an itemized worksheet. A site-specific proposal is needed.
Do I need to know my tank size first?
No. Start with your roof area, landscape demand and property constraints. Our rainwater calculator helps organize those assumptions.
Who performs the installation?
Installation is contracted directly with an independent professional. Santa Fe Cistern Installation provides planning information and a referral framework.
Are County requirements the same everywhere in Santa Fe?
No. Confirm parcel jurisdiction and development scope using our requirements guide and the appropriate authority.
Estimate roof yield · Compare cost factors · Review County rules
Get a Cistern Installation Quote